Know if the project works.

Before the drawings exist, you still need to know whether the project is viable. We build defensible early-stage budgets from the information you have, with the uncertainty clearly attached.

01 / EARLY COST PLANNING

A useful number before the drawings are ready.

You need a number before the drawings.

There is a stage before drawings exist where the only honest answer anyone gives you is “it depends.”

You have a site, or a building you are considering buying, or an idea about what you want to do with a floor. What you do not have is architectural documents, because commissioning them costs real money and you would like to know whether the project is viable before you spend it.

So you are stuck. You cannot get a meaningful estimate without drawings, and you cannot justify paying for drawings without a meaningful number.

Budget development exists precisely for that stage. It gives you a defensible number built from real cost data, with its uncertainty attached, so you can make a go or no-go decision.

The right budget for the stage you're in.

An early budget is not a detailed estimate in disguise. We match the level of analysis to the information available and tell you exactly what the resulting number can support.

01 / CONCEPT

Conceptual Budgets

Built from a written description, sketch, massing study, or conversation about what you want. Priced by building type, size, quality level, and location.

02 / SCHEMATIC

Schematic Budgets

Built from early design drawings, with major systems identified and priced by assembly rather than individual component.

03 / FEASIBILITY

Feasibility Budgets

Used to test whether a project works financially before land acquisition, building acquisition, or committing to a design team.

04 / PRO FORMA

Pro Forma Cost Inputs

Structured cost inputs for developers building a financial model, formatted to drop into the system you already use.

05 / SCENARIOS

Scenario Comparison

Compare two or three approaches, such as renovate versus rebuild, different finish levels, or a smaller building now versus a larger one later.

06 / PHASING

Phased Budgets

See what each stage will cost when work is delivered in phases, including appropriate escalation allowances for later stages.

07 / QUICK CHECK

Order-of-Magnitude Checks

A quick test when you already have a number in mind and need to know whether it is in the right postcode before doing anything else.

A budget that shows its working.

Even at the earliest stage, a useful budget should make it clear where the number came from, what assumptions drive it, and how much confidence you should place in it.

01

Total Probable Cost

A total cost expressed as a range where the available information genuinely supports a range rather than a point.

02

Major Cost Blocks

Major cost categories broken out so you can see what is actually driving the overall number.

03

Cost Per Square Foot

A reference figure for comparison and early feasibility testing.

04

Quality & Specification Level

The assumed quality level is stated clearly because it can materially change the budget.

05

Site & Location Factors

Regional and project-location considerations are applied to the actual project rather than relying blindly on national averages.

06

Soft Cost Allowances

Relevant design fees, permits, and other project costs are identified and clearly flagged as allowances.

07

Contingency

Contingency is sized appropriately for how much remains unknown and shown separately from the underlying project cost.

08

Escalation

Where construction is not starting immediately, escalation requirements are identified separately.

09

Assumptions & Exclusions

A written statement of what has been assumed and what is excluded from the budget.

10

Confidence Level

An honest indication of how much the number could move as the design and project information develop.

Transparency Matters

Being honest about precision.

An early budget is a wider instrument than a detailed estimate, and anyone who tells you otherwise is selling something.

The reason is simple. At concept stage, the decisions that drive cost have not been made yet. Structural system, envelope specification, mechanical strategy, finish level, and site conditions can each move the number materially, and none may be settled.

What we do about that is show you the range rather than hide it, tell you which unresolved decisions matter most, and price the ones that are worth exploring now.

A budget that says “somewhere between these two figures, and here is what determines which end you land on” is far more useful than a single confident number that turns out to be wrong.

As your design develops, the budget should be revisited. Clients frequently come back to us at schematic and again at design development, and because we already hold the project history, those updates cost considerably less than starting over.

Our approach: We tell you not only what the budget is, but what could move it, which unresolved decisions matter most, and how much confidence you should place in the current number.

Who this is for.

Budget development is designed for people who need to make a meaningful financial decision before a project is fully designed.

01

Developers

Testing feasibility before acquisition or committing to a design team.

02

Property Owners

Deciding whether an improvement, expansion, or conversion is worth pursuing.

03

Homeowners

Finding out whether the project they want is anywhere near the budget they have before hiring an architect.

04

Investors

Running numbers on a building they are considering purchasing or repositioning.

05

Design Teams

Establishing an early cost frame so design starts inside the client's financial reality.

06

Businesses

Planning relocation, expansion, or fit-out and needing a capital figure for internal approval.

Send us what you have.

You do not need a complete drawing set. If all you have is a description and a location, that can still be enough to start. The less information available, the wider the resulting range will be.

Any drawings, sketches, or massing studies, however rough
Approximate size in square feet and number of storeys
Building type and intended use
Project location, at least city and state
Quality and specification expectations: basic, mid-range, or high-end
Site information, existing conditions, access constraints, and known issues
Photographs for work involving an existing building
Any budget figure you already have in mind and where it came from
Your intended project timeline

From early budget to detailed estimate.

Budget development is usually the beginning of a sequence rather than a one-off. A conceptual budget tells you whether to proceed. If you do, drawings get produced, and a detailed residential or commercial estimate replaces the budget with something much tighter.

We are happy to be involved at every stage or just at this one. There is no obligation attached, and we will tell you plainly when your project has developed to the point where a full estimate would serve you better than another budget update.

01 / NOW

Conceptual Budget

Test whether the project is financially viable.

02 / DESIGN

Design Development

Update the budget as the major design decisions become known.

03 / DOCUMENTS

Detailed Estimate

Replace the early budget with tighter quantity-based pricing.

Find out if it's viable.

Describe what you are thinking about and where it is. We will tell you what we can produce from it and what it would cost.

Request a Free Quote
We're a construction estimating and consulting firm with a deliberately old-fashioned belief. A budget should be something you can trust and understand.